Real.et
List a property
Real.et

Real estate for modern Ethiopia. Houses, apartments, condominiums and land for sale or rent in Addis Ababa, plus developer profiles, guides and news.

Get it on Google Play

Property

  • Houses for sale
  • Houses for rent
  • Apartments for sale
  • Apartments for rent
  • Condominiums for sale
  • Land for sale

Areas

  • Bole
  • Ayat
  • CMC
  • Summit
  • Bole Bulbula
  • Condominium sites
  • All of Addis Ababa

Learn

  • House prices in Addis Ababa
  • Buying as a foreigner
  • Mortgages in Ethiopia
  • Furniture prices
  • Tools
  • Material prices
  • All guides
  • Real estate news

Company

  • List a property
  • New projects
  • Developers
  • Agents and brokers
  • Furniture stores
  • Interior designers
  • Contractors
  • Guest houses
  • Hotels
  • Privacy
  • Delete account

© 2026 Real.et. All rights reserved.

Contact: contact@ at real.et

  • Home
  • Explore
  • List
  • Saved
  1. Home
  2. Construction materials
  3. Concrete

Structure

Concrete price in Ethiopia

The official Addis Ababa rate for C-25 concrete in a beam or slab is ETB 19,898.87 per m³, placed, without VAT.

Updated November 11, 2026 · Latest official list: 2018 E.C. Q4

C-25 concrete, beam and slab, superstructure

ETB 19,898.87per m³

Supplied and fixed, without VAT. Official Addis Ababa rate for 2018 E.C. Q4 (Apr to Jun 2026).

Since Dec 2025
+55.8%from 12,769.87
Since Sep 2023
+113.4%from 9,326.76

Price history

C-25 concrete, ETB per m³2018 E.C. Q4 (Apr to Jun 2026): ETB 19,898.87
8,00010,00012,00014,00016,00018,00020,000Jun 2024Jun 2025Jun 20268,00010,00012,00014,00016,00018,00020,000Dec 2023Jun 2024Dec 2024Jun 2025Dec 2025Jun 2026

Each point is one quarter of the Ethiopian fiscal year, shown at the month the quarter ends. A dotted line crosses quarters with no bureau document.

Concrete rates by quarter

The bureau rate for the finished work: material, labour and equipment. Without VAT and without the contractor's overhead and profit.

Concrete supplied and fixed rates by quarter, in ETB without VAT
ItemUnitApr to Jun 2026Q4 2018 E.C.Oct to Dec 2025Q2 2018 E.C.Apr to Jun 2025Q4 2017 E.C.Jan to Mar 2025Q3 2017 E.C.Oct to Dec 2024Q2 2017 E.C.Jul to Sep 2024Q1 2017 E.C.Apr to Jun 2024Q4 2016 E.C.Jan to Mar 2024Q3 2016 E.C.Oct to Dec 2023Q2 2016 E.C.Jul to Sep 2023Q1 2016 E.C.
C-25 concretebeam and slab, superstructurem³19,898.8712,769.8711,403.9211,278.0411,305.4410,996.689,697.789,517.1710,050.209,326.76
C-25 concretecolumn and shear wall, superstructurem³20,600.2113,345.3311,907.0211,758.1411,759.4711,397.5610,098.669,904.1510,437.189,713.74
C-25 concretefooting, beam and slab, substructurem³19,216.4212,303.8710,999.4510,896.7810,958.8310,654.259,374.599,205.889,713.539,024.54
C-30 concretebeam and slab, superstructurem³20,906.8713,420.8712,006.5311,908.0412,004.8311,64210,243.7810,063.1710,596.209,872.76
Lean concrete C-7hand mixm²779.95501.29427.60420.17392.44393.12365.88353.89378.49345.10
Wooden formworkcolumn, floor beam and slabm²1,213.23946.76822.81795.43753.45765.53752.48725.03726.13739.31

Cost calculator

Pick an item and a quantity. Replace the official rate with the price from your supplier.

m³
ETB

Official rate. Type your quote.

10 m³ of c-25 concrete, beam and slab, superstructure

ETB 228,837.01

ETB 198,988.70 before VAT

What the rate covers

The rate is for concrete that a crew mixes with a machine on site and places in the formwork. It covers cement, sand, gravel, water, labour and the mixer. It does not cover formwork or rebar. The list prices those separately: wooden formwork is ETB 1,213.23 per m², and rebar is on the rebar page.

C-25 and C-30 are strength classes. C-25 is the common class for the frame of a house or a low building. C-30 is stronger and uses more cement, so it costs more: ETB 20,906.87 per m³ for a beam or slab. Lean concrete (C-7) is a thin, weak layer under footings. The list prices it by the square metre: ETB 779.95 per m².

Columns cost more than slabs

Concrete in a column or a shear wall costs more to place than concrete in a slab: ETB 20,600.21 per m³ against ETB 19,898.87 per m³. The crew lifts it higher and pours it in smaller amounts.

The price over time

C-25 concrete for a beam or slab went from ETB 9,326.76 in 2016 E.C. Q1 (Jul to Sep 2023) to ETB 19,898.87 per m³, a change of +113.4%. Cement is the main cost in concrete, so the rate follows the cement price.

The rates are direct cost only. The bureau tells users to add overhead (up to 10 percent of direct cost for contractors of grade 3 and above) and profit (7 to 13 percent, by project size). VAT of 15 percent comes on top.

Frequently asked questions

How much does a cubic metre of concrete cost in Ethiopia?

+

The official Addis Ababa rate for C-25 concrete in a beam or slab is ETB 19,898.87 per m³, mixed and placed, without VAT, for 2018 E.C. Q4 (Apr to Jun 2026). Formwork and rebar are extra.

What is the difference between C-25 and C-30 concrete?

+

The number is the strength of the concrete in megapascals after 28 days. C-30 uses more cement and costs more: ETB 20,906.87 per m³ against ETB 19,898.87 per m³ for C-25.

How much has the price of C-25 concrete changed in Addis Ababa?

+

The official rate moved from ETB 9,326.76 in 2016 E.C. Q1 (Jul to Sep 2023) to ETB 19,898.87 per m³ in 2018 E.C. Q4 (Apr to Jun 2026). That is a change of +113.4%.

Sources

  • Addis Ababa City Administration Design and Construction Works Bureau: construction works direct cost, 2018 E.C. Q4
  • Addis Ababa City Administration Design and Construction Works Bureau: construction works direct cost, 2018 E.C. Q2
  • Addis Ababa City Administration Design and Construction Works Bureau: construction works direct cost, 2017 E.C. Q4
  • Addis Ababa City Administration Design and Construction Works Bureau: construction works direct cost, 2017 E.C. Q3
  • Addis Ababa City Administration Design and Construction Works Bureau: construction works direct cost, 2017 E.C. Q2
  • Addis Ababa City Administration Design and Construction Works Bureau: construction works direct cost, 2017 E.C. Q1
  • Addis Ababa City Administration Design and Construction Works Bureau: construction works direct cost, 2016 E.C. Q4
  • Addis Ababa City Administration Design and Construction Works Bureau: construction works direct cost, 2016 E.C. Q3
  • Addis Ababa City Administration Design and Construction Works Bureau: construction works direct cost, 2016 E.C. Q2
  • Addis Ababa City Administration Design and Construction Works Bureau: construction works direct cost, 2016 E.C. Q1

These prices are reference figures for a budget. They are not a quote. Prices change every week, so get a written price from a supplier before you buy.

More material prices

  • Cement price in EthiopiaCement price in Ethiopia per quintal: the official Addis Ababa rate for PPC and OPC by quarter since 2023, market prices by brand and a cost calculator.
  • Rebar price in EthiopiaRebar price in Ethiopia per kg: official Addis Ababa rates for local and imported bar by quarter since 2023, supply only and cut, bent and fixed.
  • Sand and gravel price in EthiopiaSand, gravel, fino and red ash prices in Addis Ababa per cubic metre: the official rate by quarter since 2023, with a price chart and cost calculator.
  • All construction material pricesThe full price list by quarter.

Keep reading

  • Construction Material Prices in Ethiopia: Cement, Rebar and Building Costs (October 2026)Cement, rebar, sand, gravel, block and roofing sheet prices in Ethiopia in 2026, what drives them, and what it costs to build a house per square metre.
  • Construction companies in Addis AbabaContractors by license grade, with phone numbers and past works.